[English | 简体] Site Office Set Up
Depends on the size of project , geographical configuration of site and duration of construction period , a sizable or a series of site offices should be set up appropriately for running the day to day activities . The minor site offices could be of mobile containers equipped with general facilities while the main site office should be well set up to provide document control , meeting and administration purposes . Location of the long term site office should be carefully selected to avoid or minimize obstruction to the future site works .
[ Construction DB Tips : Site staff such as survey crew and inspectorate team are usually allocated at lobby hall of site office at ground floor beside the entrance to avoid carrying mud inside the office building . ]
Site Office Set Up Sub-Pages
|