Air Test
This test will be set up and conducted by site supervisor and the procedures in brief are as follows : – 1. Before test, the ends of the pipeline are plugged using expanding disc stoppers and one end is connected with a U-tube manometer.2. Air is to be pumped into the pipeline until a test …